DOME-LP/NH
Training dome is designed to simulate leaks in a 20″ manway LP/Ammonia rail car dome. The valve manifold allows the instructor to simulate a leaks, with water or compressed air, in the pressure relief device and two of the angle valves.
Delivery: 4-6 wks.
Literature Download: DOME LP-NHr1